Our Projects

Apron Extension and Fuel Line Installation – Shannon Airport

The construction of a new, fulldepth Pavement Quality Concrete apron (15,000m2) adjoining the new terminal extension to Alpha apron. The works required extensive diversions of existing live airfield services (fibre-optic cables, aviation fuel lines and Airfield Ground Lighting services). The works also entailed the construction of a new, fully serviced 10m wide 1km diversion road through the adjacent golf course. As part of the apron development, a new dual 450mm diameter DI fuel line was installed from the adjacent fuel farm, along with a new 1.2km of 300mm diameter DI high pressure watermains.

  • LocationShannon Airport
  • ClientDublin Airport Authority
  • Client's RepresentativeDublin Airport Authority